Document ID ca-yiam-2020-09-22 Title YMX International Aerocity of Mirabel - Installation and operation of a groundwater pumping and treatment system URL https://iaac-aeic.gc.ca/050/evaluations/proj/80890 Jurisdiction /ca Subdomain(s) Groundwater, Wastewater, Industrial Water Language en Status completed Analyzed at 2026-03-19 10:28:51.114180+00:00 Relevance Authorization and technical summary of a groundwater treatment system.

Q Qualitative Requirements (7)

Req ID Category Intent Legal Status Name Subdomain(s) Context Conditions Confidence
#Q001designtreatmentmandatoryGroundwater treatment system designwastewater, otherThe treatment applied will be through a series of activated carbon filters, an effective treatment for the treatment of organic compounds, particularly those targeted in this project. Filters will be present upstream of the activated carbon to remove suspended solids.Applicable to the installation and operation of the groundwater pumping and treatment system.high
#Q002operationaloperationalmandatoryTree cutting schedule restrictionothercutting down trees outside of migratory bird nesting periodsMeasures will be taken to mitigate impacts on flora and fauna.high
#Q003operationaloperationalmandatoryInvasive species managementothermanaging invasive exotic speciesMeasures will be taken to mitigate impacts on flora and fauna.high
#Q004operationaloperationalmandatoryWetland protectionotherprotecting wetlands present in the sectorMeasures will be taken to mitigate impacts on flora and fauna.high
#Q005operationaltreatmentmandatorySuspended solids mitigation in surface wateraquatic life, wastewaterimplementing measures to limit suspended solids in the Belle-RivièreMeasures will be taken to mitigate impacts on flora and fauna.high
#Q006operationaloperationalmandatoryFish habitat protectionaquatic lifelimiting encroachment into fish habitatMeasures will be taken to mitigate impacts on flora and fauna.high
#Q007monitoringoperationalmandatoryGroundwater level monitoring wells installationotherGroundwater level measurement wells will be installed to ensure that there is no variation in the level of the water table so as not to cause a lowering of the level that could affect water wells to the south.high

P Quantitative Requirements (1)

Req ID Category Intent Legal Status Name Subdomain(s) Limit Type Limit Value Context Conditions Confidence
#R001designtreatmentmandatoryNumber of pumping wellsotherrequirement5 wellsThe project consists of the installation of five pumping wells to pump groundwater, perform groundwater treatment, and discharge treated water into injection wells and the Belle-Rivière RiverWithin the airport boundarieshigh