Document ID ca-tobr-2021-08-05 Title Town of Bridgewater - Wastewater System Upgrades - Phase 1 URL https://iaac-aeic.gc.ca/050/evaluations/proj/80422 Jurisdiction /ca Subdomain(s) Wastewater, Infrastructure Language en Status completed Analyzed at 2026-03-18 15:54:11.230703+00:00 Relevance Environmental assessment and approval for wastewater infrastructure upgrades.

Q Qualitative Requirements (13)

Req ID Category Intent Legal Status Name Subdomain(s) Context Conditions Confidence
#Q001operationaloperationalmandatoryPost-Drilling BackfillwastewaterAll will be backfilled upon completionUpon completion of horizontal drillinghigh
#Q002designoperationalmandatoryPumping Station Flood ProtectionwastewaterThe new pumping station will be constructed 4.1 m above ground level to protect against water level changes of the LaHave Riverhigh
#Q003operationaloperationalmandatoryErosion and Sedimentation Control BMPswastewater, aquatic lifeDuring the work, best management practices related to erosion and sedimentation control will be implemented to protect adjacent freshwater habitats.During the workhigh
#Q004designoperationalmandatorySite-Specific Erosion and Sediment Controlwastewater, aquatic lifeSite-specific Erosion and Sediment Control measures will be required.high
#Q005operationaltreatmentmandatoryAcidified Water Generation MitigationwastewaterSite specific measures will be employed to reduce the potential for generation of acidified water.Interactions with sulphide bearing bedrockhigh
#Q006prohibitionoperationalmandatoryProhibition of In-Water Workwastewater, aquatic lifeNo work is proposed in the waters of the LaHave River.medium
#Q007operationaloperationalmandatoryDry Season Trench Work and Water Removalwastewater, aquatic lifeAll trench work will be conducted in the dry season, with accumulated trench water to be removed in a manner to prevent sedimentation in natural waters.During trench workhigh
#Q008designoperationalmandatoryConduit Placement RequirementwastewaterNew conduits are to be installed, extending underneath existing sidewalks (and where required)high
#Q009operationaloperationalmandatoryDrill Rig Site SpecificationwastewaterA 25 x 25 m area will be excavated (1 m depth) and levelled for the drill rig to be installed on the northeast side of King Streethigh
#Q010designoperationalmandatoryPumping Station Upgrade SitewastewaterThe existing pumping station #11 will be upgraded at its current locationhigh
#Q011designoperationalmandatoryRiver Crossing AlignmentwastewaterThe river crossing alignment will be between a parking lot adjacent to the intersection of School St. and King St. and Mariners Landing Park.high
#Q012administrativereportingmandatoryAuthority Assessment ResponsibilityotherThe listed authorities are responsible for the project assessment.Applies to Infrastructure Canada and Transport Canada for this non-designated project on federal lands.high
#Q013designoperationalmandatoryTrench Location SpecificationwastewaterExcavated trenches on the north side of LaHave Riverhigh

P Quantitative Requirements (4)

Req ID Category Intent Legal Status Name Subdomain(s) Limit Type Limit Value Context Conditions Confidence
#P001designoperationalmandatoryPumping station construction elevationwastewaterrequirement4.1 mabove ground level to protect against water level changes of the LaHave Rivermedium
#P002designoperationalmandatoryForcemain installation lengthwastewaterrequirementapprox. 1,000 minstallation of forcemain for wastewater system upgradespart of project scopehigh
#P003designoperationalmandatoryDrill rig excavation areaotherrequirement25 x 25 marea excavated and levelled for the drill rig on the northeast side of King Streethigh
#P004designoperationalmandatoryDrill rig excavation depthotherrequirement1 mdepth of excavation for the drill rig installation areahigh