| #P001 | design | unknown | unknown | gravity sanitary sewers | wastewater | unknown | 314 m | The proposed project consists of construction of 314 m of gravity sanitary sewers | | low |
| #P002 | design | unknown | unknown | HDPE DR 11 forcemain | wastewater | unknown | 3,100 m | The proposed project consists of construction of 314 m of gravity sanitary sewers, 3,100 m of HDPE DR 11 forcemain, two sewer pump stations. | | low |
| #P003 | design | operational | unknown | Sewer pump stations | wastewater | requirement | 2 units | The proposed project consists of construction of 314 m of gravity sanitary sewers, 3,100 m of HDPE DR 11 forcemain, two sewer pump stations. | | high |
| #P004 | design | operational | mandatory | gravity sanitary sewer length | wastewater | requirement | 314 m | The proposed project consists of construction of 314 m of gravity sanitary sewers, 3,100 m of HDPE DR 11 forcemain, two sewer pump stations. | | high |
| #P005 | design | operational | mandatory | HDPE forcemain length | wastewater | requirement | 3100 m | The proposed project consists of construction of 314 m of gravity sanitary sewers, 3,100 m of HDPE DR 11 forcemain, two sewer pump stations. | | high |
| #P006 | design | operational | mandatory | HDPE pipe dimension ratio | wastewater | requirement | 11 DR | 3,100 m of HDPE DR 11 forcemain | | high |