| Req ID | Category | Intent | Legal Status | Name | Subdomain(s) | Context | Conditions | Confidence |
|---|---|---|---|---|---|---|---|---|
| #Q001 | administrative | unknown | mandatory | Project Assessment Responsibility | other | The listed authorities are responsible for the project assessment. | Applies to this non-designated project on federal lands or outside Canada. | medium |
| #Q002 | operational | treatment | mandatory | Fish Habitat Timing Window | aquatic life | Dredging is proposed during the June 16 - February 28 least risk window for fish and fish habitat. | During dredging operations | high |
| #Q003 | operational | operational | mandatory | Dredging Methodology | other | Dredging will be conducted using a clamshell bucket from a barge mounted derrick. | Dredging phase of project | high |
| #Q004 | operational | treatment | mandatory | Sediment Disposal Protocol | other | Once loading is complete, the dredged materials will be towed and disposed at sea. | Post-loading completion | high |
| #Q005 | operational | operational | mandatory | Scow Barge Positioning | other | Dredged sediment will be loaded on to an adjacent flat scow barge, positioned within the water lot. | During the loading phase of dredging operations | high |
| #Q006 | operational | operational | mandatory | Project Completion Duration | other | The works will take up to 3 days. | Total duration of the maintenance dredging activities | high |
| Req ID | Category | Intent | Legal Status | Name | Subdomain(s) | Limit Type | Limit Value | Context | Conditions | Confidence |
|---|---|---|---|---|---|---|---|---|---|---|
| #P001 | physical | operational | mandatory | accumulated sediment and wood waste | other | requirement | <= 4000 cubic metres | Teal-Jones Group proposes to conduct maintenance dredging of up to 4,000 cubic metres of accumulated sediment and wood waste from their industrial water lot. | Maintenance dredging | high |
| #P002 | design | operational | guidance | average target depth | other | OG | -1.9 meters Local Low Water (LLW) | The average target depth is -1.9 meters Local Low Water (LLW). | high | |
| #P003 | design | operational | mandatory | Maximum depth | other | MAC | -4 meters LLW | Maximum depth will be -4 meters LLW at the eastern, deeper parts of the proposed footprint | at the eastern, deeper parts of the proposed footprint | high |
| #P004 | design | operational | mandatory | depth | other | requirement | 1 meter | and will be 1 meter in the shallower parts of the dredge boundary. | in the shallower parts of the dredge boundary | high |
| #P005 | operational | operational | mandatory | Works duration | other | requirement | <= 3 days | The works will take up to 3 days. | Applies to the duration of the proposed maintenance dredging activities | high |