Document ID ca-swwwu-2026-01-19 Title Sturgeon Weir Water and Wastewater Upgrades URL https://iaac-aeic.gc.ca/050/evaluations/proj/89772 Jurisdiction /ca Subdomain(s) Wastewater, Drinking Water Language en Status completed Analyzed at 2026-03-20 07:52:29.329051+00:00 Relevance Permitting and technical upgrades for water and wastewater infrastructure.

Q Qualitative Requirements (5)

Req ID Category Intent Legal Status Name Subdomain(s) Context Conditions Confidence
#Q001designoperationalmandatoryForested Buffers MaintenancewastewaterForested buffers will be maintained around the property edges where possible.where possiblehigh
#Q002administrativeunknownmandatoryLagoon Expansion ApprovalwastewaterExpansion of the existing lagoon requires approval from the Government of Manitoba under applicable acts and regulations.high
#Q003administrativeoperationalmandatoryLagoon Operating LicencewastewaterThe existing lagoon is currently operating under an existing Environment Act licence and will continue to operate under the same licence following expansion.following expansionhigh
#Q004designtreatmentmandatoryWater Treatment Plant Upgradesdrinking waterThe WTP be upgraded to include mechanical, treatment process, and electrical components, and a new standby generator and two new raw water wells will be added.high
#Q005designoperationalmandatoryClay Sourcing LocationwastewaterClay for the lagoon cell liner will be sourced from a borrow pit located approximately 3.5 km north of the existing lagoon.high

P Quantitative Requirements (5)

Req ID Category Intent Legal Status Name Subdomain(s) Limit Type Limit Value Context Conditions Confidence
#R001designoperationalmandatoryDesign Population Horizonwastewaterrequirement20 yearsRequirement for the design population capacity of the community of Sturgeon Landinghigh
#R002designtreatmentmandatoryLagoon Cell Countwastewaterrequirement2 cellsExpansion of the facultative lagoon systemhigh
#R003designtreatmentmandatoryLagoon Expansion Areawastewaterrequirement7 hectaresApproximately 7 hectares of land for the two-cell facultative lagoon expansionhigh
#R004designoperationalmandatoryNew Raw Water Wellsdrinking waterrequirement2 wellsAddition of new raw water wells to the current water treatment plant (WTP)high
#R005designoperationalmandatoryNew Standby Generator Countdrinking waterrequirement1 generatorA new standby generator is to be added as part of the mechanical, treatment, and electrical upgrades to the WTP.high

D Definitions (0)

No definitions.