Document ID ca-swtpuep-2023-04-19 Title STPFN Wastewater Treatment Plant Upgrade and Expansion Project URL https://iaac-aeic.gc.ca/050/evaluations/proj/82963 Jurisdiction /ca Subdomain(s) Wastewater treatment, Wastewater collection, Sludge management Language en Status completed Analyzed at 2026-03-19 08:48:43.306345+00:00 Relevance Project assessment and approval for wastewater infrastructure on federal lands.

Q Qualitative Requirements (20)

Req ID Category Intent Legal Status Name Subdomain(s) Context Conditions Confidence
#Q001monitoringoperationalmandatoryEffluent MonitoringwastewaterThe effluent will be monitored continuously to confirm it meets the effluent discharge criteria as described in the Wastewater Systems Effluent Regulations(2017).During operationhigh
#Q002corrective_actionoperationalmandatoryEmergency Wastewater DischargewastewaterShould a flood event occur, the South WWTP will discharge wastewater overflows to Island Lake via a 300 mm gravity effluent overflow outfall as an emergency measure.Should a flood event occurhigh
#Q003operationaltreatmentmandatorySludge Dewatering and HaulingwastewaterSludge will be de-watered using de-watering trailers and approximately 1.73 m/day of de-watered sludge will be hauled to the sludge drying beds on a regular basis (approximately every 7 days).During operationhigh
#Q004operationaloperationalmandatoryDried Sludge DisposalwastewaterDried sludge will be hauled to the neighboring community landfill site, on an as-needed basis, to be used as interim cover material.As neededhigh
#Q005operationaloperationalmandatoryNorth WWTP Decommissioning Waste HandlingwastewaterSewage and liquid wastes from the North WWTP will be hauled to the new truck haul wastewater receiving station while the sludge would be disposed of at the sludge drying beds following dewatering.During decommissioning of the North WWTPhigh
#Q006operationaloperationalmandatoryLift Station #4 Decommissioning Waste HandlingwastewaterDuring decommissioning of Lift Station #4, sewage and liquid wastes will be hauled to the new truck haul wastewater receiving station.During decommissioning of Lift Station #4high
#Q007operationaloperationalmandatoryLift Station #4 Infrastructure DisposalwastewaterThe internal infrastructure (piping, valves, pumps, etc.) will be removed and disposed of at the landfill.During decommissioning of Lift Station #4high
#Q008operationaloperationalmandatoryLift Station #4 Control Panel SalvagewastewaterThe control panel will be salvaged and handed over to STPFN to use as parts for the other lift stations in the community.During decommissioning of Lift Station #4high
#Q009operationaloperationalmandatoryGeneral Office Waste DisposalotherGeneral office waste will be sent to the local community waste disposal ground.During operationhigh
#Q010operationaloperationalmandatoryContinuous Effluent Discharge MethodwastewaterTreated wastewater effluent will be discharged to Island Lake on a continuous basis through the existing discharge/outfall structure.During operationhigh
#Q011administrativeoperationalguidanceNorth WWTP Building Retention OptionotherDuring decommissioning of the North WWTP, STPFN may choose to retain the existing WWTP building for a future use as a storage facility.During decommissioning of the North WWTPhigh
#Q012administrativereportingmandatoryProject Assessment ResponsibilityotherThe listed authorities are responsible for the project assessment.Non-designated project assessmenthigh
#Q013designoperationalmandatoryNorth Lift Station Construction and ConnectionwastewaterConstructing a new lift station (North Lift Station) installed approximately 10 m north of the North WWTP to service the north catchment area of STPFN and convey wastewater to the South WWTP.During project construction phasehigh
#Q014designoperationalmandatoryNorth Lift Station Sewer InstallationwastewaterInstalling a 250 mm diameter gravity sewer connecting the manhole of the North WWTP (MH 79) to the North Lift Station.During project construction phasehigh
#Q015designoperationalmandatorySouth WWTP Expansion ComponentswastewaterUpgrading, repairing, and expanding the existing South WWTP, including construction of the expanded superstructure, new truck dump pad and manhole, installation/repairs to process and mechanical equipment, a new 300 mm gravity effluent overflow outfall discharging to rip rap east of the superstructure on the shore of Island Lake, and a new 375 mm gravity sewer line (approximately 60 m in length) to Manhole #4.During project expansion phasehigh
#Q016operationaloperationalmandatorySludge Drying Bed Upgrade ProcedureswastewaterUpgrading the sludge drying beds by draining away the liquid and hauling it to the South WWTP, allowing sludge to dry, pushing sludge into stockpiles, and re-grading the site to prevent accumulation of rain/snow.During upgrade of sludge drying bedshigh
#Q017designoperationalmandatoryAccess Road Upgrade for Truck AccessotherUpgrading (widening) and re-surfacing the access road to the sludge drying beds to accommodate truck turn around.During access road upgradinghigh
#Q018designoperationalmandatoryHDPE Forcemain InstallationwastewaterInstalling a new 200 mm high density polyethylene (HDPE) forcemain (approximately 2.65 km in length) connecting the North Lift Station to existing gravity sewer at Manhole #8.Project construction phasehigh
#Q019designoperationalmandatoryLift Station #4 Decommissioning and Sewer InstallationwastewaterDecommissioning the existing Lift Station #4 and installing a new 200 mm diameter gravity sewer line (approximately 8 m in length) to convey wastewater flowing from the decommissioned lift station #4 to the North Lift Station.Project decommissioning and construction phasehigh
#Q020designoperationalmandatoryNorth WWTP Decommissioning ActionwastewaterDecommissioning of the North WWTP.Project decommissioning phasehigh

P Quantitative Requirements (18)

Req ID Category Intent Legal Status Name Subdomain(s) Limit Type Limit Value Context Conditions Confidence
#P001designtreatmentunknown20-year projected flows capacitywastewaterrequirement2,100 m/dayWith the expansion, it will have the capacity to meet 20-year projected flows of an average 2,100 m/day.Future community growth / 20-year projectionhigh
#P002designoperationalunknownGravity sewer diameter (MH 79 to North Lift Station)wastewaterrequirement250 mmInstalling a 250 mm diameter gravity sewer connecting the manhole of the North WWTP (MH 79) to the North Lift Station.high
#P003designoperationalunknownGravity sewer line diameter (from decommissioned Lift Station #4)wastewaterrequirement200 mmInstalling a new 200 mm diameter gravity sewer line (approximately 8 m in length) to convey wastewaterhigh
#P004designoperationalunknownHDPE forcemain diameterwastewaterrequirement200 mmInstalling a new 200 mm high density polyethylene (HDPE) forcemainhigh
#P005designoperationalunknownGravity effluent overflow outfall diameterwastewaterrequirement300 mma new 300 mm gravity effluent overflow outfall discharging to rip rap east of the superstructureShould a flood event occur, the South WWTP will discharge wastewater overflowshigh
#P006designoperationalunknownGravity sewer line diameter (to Manhole #4)wastewaterrequirement375 mmand a new 375 mm gravity sewer line (approximately 60 m in length) to Manhole #4high
#P007operationaloperationalunknownTreated wastewater effluent flowwastewaterunknown40 L/sDuring operation, the WWTP treatment process produces sludge (56 m/day at 0.85% solids) and treated wastewater effluent (40 L/s).During operationhigh
#P008designtreatmentunknownUpgraded South WWTP average design capacitywastewaterrequirement1,480 m/dayThe upgraded South WWTP currently has an average design capacity of 1,480 m/day.Current design capacity after upgradehigh
#P009operationaltreatmentunknownWastewater treatment process sludge productionwastewaterrequirement56 m/daythe WWTP treatment process produces sludge (56 m/day at 0.85% solids)During operationhigh
#P010physicaltreatmentunknownSludge solids concentrationwastewaterrequirement0.85 %the WWTP treatment process produces sludge (56 m/day at 0.85% solids)During operationhigh
#P011operationaloperationalunknownDe-watered sludge hauling ratewastewaterrequirement1.73 m/dayapproximately 1.73 m/day of de-watered sludge will be hauled to the sludge drying bedsRegular basishigh
#P012operationaloperationalunknownSludge hauling frequencywastewaterrequirement7 dayshauled to the sludge drying beds on a regular basis (approximately every 7 days)Regular operationhigh
#P013designoperationalunknownGravity sewer length (LS #4 to North Lift Station)wastewaterrequirement8 minstalling a new 200 mm diameter gravity sewer line (approximately 8 m in length)Conveying wastewater from decommissioned lift station #4high
#P014designoperationalunknownHDPE forcemain lengthwastewaterrequirement2.65 kmInstalling a new 200 mm high density polyethylene (HDPE) forcemain (approximately 2.65 km in length)Connecting North Lift Station to Manhole #8high
#P015designoperationalunknownGravity sewer line length (to Manhole #4)wastewaterrequirement60 ma new 375 mm gravity sewer line (approximately 60 m in length) to Manhole #4high
#P016designtreatmentunknown2021 on-reserve populationwastewaterrequirement4,062 peopleThe 2021 on-reserve population is 4,062 people (INAC, 2021).As of 2021high
#P017designoperationalunknownSludge drying bed distancewastewaterrequirement5 kmthe sludge drying bed area, located approximately 5 km south of the South WWTPRelative to South WWTPhigh
#P018designoperationalunknownNorth Lift Station location offsetwastewaterrequirement10 mConstructing a new lift station (North Lift Station) installed approximately 10 m north of the North WWTPRelative to North WWTPhigh