Document ID ca-prfnle-2022-06-17 Title Poplar River First Nation Lagoon Expansion URL https://iaac-aeic.gc.ca/050/evaluations/proj/83280 Jurisdiction /ca Subdomain(s) Wastewater treatment, Infrastructure and planning Language en Status completed Analyzed at 2026-03-19 10:27:20.121441+00:00 Relevance Environmental determination and authorization for wastewater lagoon expansion.

Q Qualitative Requirements (17)

Req ID Category Intent Legal Status Name Subdomain(s) Context Conditions Confidence
#R001administrativeunknownmandatoryProject Assessment ResponsibilityotherThe listed authorities are responsible for the project assessment.high
#R002designtreatmentmandatoryDike Construction and Interior Slope ProtectionwastewaterConstruct cell dikes and add rip rap to interior slopeshigh
#R003designoperationalmandatoryIntercell and Discharge Piping InstallationwastewaterInstall intercell and discharge pipeshigh
#R004designoperationalmandatoryForcemain Installation and Tie-inwastewaterInstall new forcemain from new lagoon cell and tie into existing forcemainhigh
#R005operationaloperationalmandatoryAbandonment of Existing ForcemainwastewaterCap and abandon existing forcemain to existing lagoon cellhigh
#R006designtreatmentmandatoryChemical Addition Building ConstructionwastewaterConstruct chemical addition buildinghigh
#R007designoperationalmandatoryWater Tank InstallationwastewaterInstall water tank for buildinghigh
#R008designoperationalmandatoryElectrical Power InstallationwastewaterInstall electrical power to buildinghigh
#R009designoperationalmandatoryPerimeter Ditching ConstructionwastewaterConstruct new perimeter ditching around new lagoon cellshigh
#R010designoperationalmandatoryPerimeter Fencing InstallationwastewaterInstall perimeter fencing around new lagoon cellshigh
#R011designoperationalmandatoryAccess Road and Truck Turnaround ConstructionwastewaterConstruct an access road approach and truck turnaroundhigh
#R012designoperationalmandatoryTree ClearingwastewaterClear treeshigh
#R013designoperationalmandatoryStump GrubbingwastewaterGrub tree stumps from the development areahigh
#R014designoperationalmandatoryTopsoil Removal and ExcavationwastewaterRemove topsoil and excavate cell areashigh
#R015designoperationalmandatoryPerimeter Trail ConstructionwastewaterConstruct a perimeter trail around the new lagoon cells.high
#R016designunknownmandatoryLagoon Design CapacitywastewaterThe Poplar River First Nation requires a lagoon expansion to service the growing community to design year 20.high
#R017designunknownmandatorySite Re-seedingwastewaterThe project will include clearing, grubbing, excavation of two new facultative cells, perimeter drainage ditching, access approach, forcemain piping extension, chemical addition building, fencing and re-seeding.Post-construction activityhigh