Document ID ca-plfsps-2021-02-26 Title Piapot Lagoon, Forcemain and Sewage Pumping Station URL https://iaac-aeic.gc.ca/050/evaluations/proj/81108 Jurisdiction /ca Subdomain(s) Wastewater treatment, Infrastructure and distribution Language en Status completed Analyzed at 2026-03-20 07:46:16.319585+00:00 Relevance Project assessment and determination for new wastewater infrastructure.

Q Qualitative Requirements (9)

Req ID Category Intent Legal Status Name Subdomain(s) Context Conditions Confidence
#Q001administrativeunknownmandatoryProject Assessment ResponsibilitywastewaterThe listed authorities are responsible for the project assessment.Applies to the listed authorities assessing the non-designated project on federal lands.high
#Q002designtreatmentmandatoryLagoon Site Construction ProcedureswastewaterVegetation will be stripped. Topsoil will be removed and stock piled. Berm material will be excavated, relocated and packed in place. HDPE liner will be installed on lagoon floor and fused. Topsoil will be replaced and seeded.Applies to the construction of the lagoon site.high
#Q003designoperationalmandatorySewage Force Main Construction ProcedureswastewaterTopsoil will be stripped. An approximate 3 meter trench will be excavated, DR 9 Sewage force main will be installed, and back filled. Topsoil will be replaced and seeded. Pipe sections under the Qu'Appelle River will be directionally drilled.Applies to the installation of the new HDPE sewage force main.high
#Q004designoperationalmandatorySewage Pumping Station Construction ProcedureswastewaterNew Sewage Pumping Station site will be excavated. Mud slab will be poured followed by a bottom slab. Walls will be formed reinforced and poured. Followed by a top slab. Small building will enclose the structure.Applies to the construction of the new sewage pumping station.high
#Q005designtreatmentmandatoryLagoon Design Specificationswastewaterconstruction of a two celled HDPE lined facultative lagoon (primary cell 2.2ha, Storage: 91,000 Cu.m)Core design requirement for the new lagoon construction.high
#Q006designoperationalmandatorySewage Pumping Station Designwastewaterconstruction of a new sewage pumping station (70Sq.M with a storage capacity of 50,000L)Core design requirement for the new pumping station.high
#Q007designoperationalmandatoryExisting Lift Station Upgradeswastewaterupgrades to the mechanical and electrical of an existing lift stationRequired upgrades to existing infrastructure as part of project scope.high
#Q008designoperationalmandatorySewage Force Main ScopewastewaterInstallation of a new HDPE sewage force main to the new lagoon location.Required installation to connect infrastructure.high
#Q009designoperationalmandatoryPumping Station Interior EquipmentwastewaterInside the building will be a propane/natural Gas generator, electrical and mechanical equipment.Interior equipment requirements for the new pumping station building.high

P Quantitative Requirements (8)

Req ID Category Intent Legal Status Name Subdomain(s) Limit Type Limit Value Context Conditions Confidence
#R001designtreatmentmandatoryLagoon primary cell areawastewaterrequirement2.2 haConstruction of a two celled HDPE lined facultative lagoonPart of the Piapot Lagoon projecthigh
#R002designtreatmentmandatoryLagoon storage capacitywastewaterrequirement91,000 Cu.mConstruction of a two celled HDPE lined facultative lagoonhigh
#R003designoperationalmandatorySewage pumping station areawastewaterrequirement70 Sq.MConstruction of a new sewage pumping stationhigh
#R004designtreatmentmandatorySewage pumping station storage capacitywastewaterrequirement50,000 LConstruction of a new sewage pumping station with storage capacityhigh
#R005designoperationalguidanceAnticipated infrastructure life spanwastewaterrequirement>= 30 yearsExpected duration for infrastructureWith proper operation and maintenancehigh
#R006designoperationalmandatorySewage force main trench depthwastewaterrequirement~ 3 meterExcavation for the installation of the sewage force mainhigh
#R007designoperationalmandatorySewage force main dimension ratiowastewaterrequirement9 DRSpecification for the HDPE sewage force main pipehigh
#R008designtreatmentmandatoryLagoon cell countwastewaterrequirement2 cellsConstruction of a two celled HDPE lined facultative lagoonhigh