| #Q001 | administrative | unknown | mandatory | Project Assessment Responsibility | wastewater | The listed authorities are responsible for the project assessment. | Applies to the listed authorities assessing the non-designated project on federal lands. | high |
| #Q002 | design | treatment | mandatory | Lagoon Site Construction Procedures | wastewater | Vegetation will be stripped. Topsoil will be removed and stock piled. Berm material will be excavated, relocated and packed in place. HDPE liner will be installed on lagoon floor and fused. Topsoil will be replaced and seeded. | Applies to the construction of the lagoon site. | high |
| #Q003 | design | operational | mandatory | Sewage Force Main Construction Procedures | wastewater | Topsoil will be stripped. An approximate 3 meter trench will be excavated, DR 9 Sewage force main will be installed, and back filled. Topsoil will be replaced and seeded. Pipe sections under the Qu'Appelle River will be directionally drilled. | Applies to the installation of the new HDPE sewage force main. | high |
| #Q004 | design | operational | mandatory | Sewage Pumping Station Construction Procedures | wastewater | New Sewage Pumping Station site will be excavated. Mud slab will be poured followed by a bottom slab. Walls will be formed reinforced and poured. Followed by a top slab. Small building will enclose the structure. | Applies to the construction of the new sewage pumping station. | high |
| #Q005 | design | treatment | mandatory | Lagoon Design Specifications | wastewater | construction of a two celled HDPE lined facultative lagoon (primary cell 2.2ha, Storage: 91,000 Cu.m) | Core design requirement for the new lagoon construction. | high |
| #Q006 | design | operational | mandatory | Sewage Pumping Station Design | wastewater | construction of a new sewage pumping station (70Sq.M with a storage capacity of 50,000L) | Core design requirement for the new pumping station. | high |
| #Q007 | design | operational | mandatory | Existing Lift Station Upgrades | wastewater | upgrades to the mechanical and electrical of an existing lift station | Required upgrades to existing infrastructure as part of project scope. | high |
| #Q008 | design | operational | mandatory | Sewage Force Main Scope | wastewater | Installation of a new HDPE sewage force main to the new lagoon location. | Required installation to connect infrastructure. | high |
| #Q009 | design | operational | mandatory | Pumping Station Interior Equipment | wastewater | Inside the building will be a propane/natural Gas generator, electrical and mechanical equipment. | Interior equipment requirements for the new pumping station building. | high |