Parameter Viewer

Document ID ca-nmtwwlip-2025-06-05 Title North MÎnÎ ThnÎ Water and Wastewater Linear Infrastructure Project URL https://iaac-aeic.gc.ca/050/evaluations/proj/89463 Jurisdiction /ca Subdomain(s) Drinking Water, Wastewater Language en Status completed Analyzed at 2026-03-18 14:37:37.940809+00:00 Relevance Environmental assessment and approval for water and wastewater infrastructure.

Q Qualitative Requirements (3)

Req ID Category Intent Legal Status Name Subdomain(s) Context Conditions Confidence
#R001designoperationalmandatoryHwy 1A Crossing Construction Methoddrinking water, wastewaterthe two proposed Hwy 1A crossings (to be completed using HDD methods)Specifically for Hwy 1A crossingshigh
#R002administrativereportingmandatorySignificant Adverse Environmental Effects DeterminationotherThe Indigenous Services Canada is considering comments received to help inform its determination on whether the carrying out of the project is likely to cause significant adverse environmental effects.Following the public comment periodhigh
#R003designoperationalguidanceRoad Disturbance Minimizationdrinking water, wastewaterthe majority of the alignment runs along disturbed roadside ditches to minimize road disturbance as much as possibleDuring pipeline alignment designmedium

P Quantitative Requirements (4)

Req ID Category Intent Legal Status Name Subdomain(s) Limit Type Limit Value Context Conditions Confidence
#R004physicalreportingmandatoryFish Inventory Screening Radiusaquatic liferequirement1 kilometreAlberta Fish and Wildlife Information Management System screening radius for fish inventories.Specifically applied to bull trout potentially occurring in Bow River/Ghost Lake Reservoir.high
#R005physicalreportingguidelineNearby Assessment Search Radiusotherrequirement200 kilometresDistance within which nearby assessments are listed on the Impact Assessment Agency of Canada registry.high
#R006designoperationalmandatoryNumber of Hwy 1A Crossingsotherrequirement2 crossingsProposed Hwy 1A crossings to be completed using HDD methods.Crossings must use HDD methods.high
#R007physicaloperationalmandatoryNumber of Watercourse Crossingsaquatic life, otherrequirement2 watercoursesEphemeral unnamed mapped watercourses (ID64559 & ID64590) will be crossed by the project.high

D Definitions (0)

No definitions.