| Req ID | Category | Intent | Legal Status | Name | Subdomain(s) | Context | Conditions | Confidence |
|---|---|---|---|---|---|---|---|---|
| #R001 | design | operational | mandatory | Hwy 1A Crossing Construction Method | drinking water, wastewater | the two proposed Hwy 1A crossings (to be completed using HDD methods) | Specifically for Hwy 1A crossings | high |
| #R002 | administrative | reporting | mandatory | Significant Adverse Environmental Effects Determination | other | The Indigenous Services Canada is considering comments received to help inform its determination on whether the carrying out of the project is likely to cause significant adverse environmental effects. | Following the public comment period | high |
| #R003 | design | operational | guidance | Road Disturbance Minimization | drinking water, wastewater | the majority of the alignment runs along disturbed roadside ditches to minimize road disturbance as much as possible | During pipeline alignment design | medium |
| Req ID | Category | Intent | Legal Status | Name | Subdomain(s) | Limit Type | Limit Value | Context | Conditions | Confidence |
|---|---|---|---|---|---|---|---|---|---|---|
| #R004 | physical | reporting | mandatory | Fish Inventory Screening Radius | aquatic life | requirement | 1 kilometre | Alberta Fish and Wildlife Information Management System screening radius for fish inventories. | Specifically applied to bull trout potentially occurring in Bow River/Ghost Lake Reservoir. | high |
| #R005 | physical | reporting | guideline | Nearby Assessment Search Radius | other | requirement | 200 kilometres | Distance within which nearby assessments are listed on the Impact Assessment Agency of Canada registry. | high | |
| #R006 | design | operational | mandatory | Number of Hwy 1A Crossings | other | requirement | 2 crossings | Proposed Hwy 1A crossings to be completed using HDD methods. | Crossings must use HDD methods. | high |
| #R007 | physical | operational | mandatory | Number of Watercourse Crossings | aquatic life, other | requirement | 2 watercourses | Ephemeral unnamed mapped watercourses (ID64559 & ID64590) will be crossed by the project. | high |
No definitions.