| Req ID | Category | Intent | Legal Status | Name | Subdomain(s) | Context | Conditions | Confidence |
|---|---|---|---|---|---|---|---|---|
| #R001 | operational | operational | mandatory | Decommissioning of Existing Facility | drinking water | The existing WTP will be decommissioned upon completion of the new facility. | Upon completion of the new facility | high |
| #R002 | administrative | reporting | mandatory | Project Assessment Responsibility | other | The listed authorities are responsible for the project assessment. | high |
| Req ID | Category | Intent | Legal Status | Name | Subdomain(s) | Limit Type | Limit Value | Context | Conditions | Confidence |
|---|---|---|---|---|---|---|---|---|---|---|
| #R003 | design | operational | mandatory | Facility total area (square meters) | drinking water | requirement | 3200 sq. m. | Total area of facility, including gravel surfaces and truck load out. | high | |
| #R004 | design | operational | mandatory | Initial design period | drinking water | requirement | 10 year | The process is sized to meet the ten year design period. | high | |
| #R005 | design | operational | mandatory | Expansion design period | drinking water | requirement | 20 year | Room for expansion to meet the twenty year design period. | high |
No definitions.