| #Q001 | administrative | unknown | mandatory | Project Assessment Responsibility | wastewater | The listed authorities are responsible for the project assessment. | Applies to non-designated projects on federal lands or outside Canada | high |
| #Q002 | treatment | treatment | mandatory | Lagoon Treatment Scope | wastewater | The lagoon will treat raw sewage. | | medium |
| #Q003 | design | operational | mandatory | Force Main Burial Depth | wastewater | Force mains will be buried to a minimum of 3m cover. | Construction of sewage force mains | high |
| #Q004 | design | treatment | mandatory | Design Population Capacity | wastewater | It has been design to meet the ten year population growth, with allowances for expansion to meet the twenty year design. | Lagoon design phase | high |
| #Q005 | design | treatment | mandatory | Lagoon Surface Area | wastewater | Total area of the lagoon will be 16ha. | Lagoon construction | high |
| #Q006 | design | operational | mandatory | Sewage Pumping Station Area | wastewater | Sewage pumping stations will use an area of 0.1ha each (2). | Construction of two sewage pumping stations | high |
| #Q007 | design | operational | mandatory | Lagoon and Pumping Station Construction Obligation | wastewater | Design and construct a new lagoon and Sewage Pumping Station on Muskowekwan IR 85 within Sec15 TP27 R15 W2M (lagoon & sewage pumping station), Sec14 TP27 R15 W2M (sewage force main), and Sec 11 TP27 R15 W2M (sewage force main & sewage pumping station). | Muskowekwan IR 85 project boundaries | high |