Parameter Viewer

Document ID ca-mlsps-2020-12-04 Title Muskowekwan Lagoon & Sewage Pumping Station URL https://iaac-aeic.gc.ca/050/evaluations/proj/81094 Jurisdiction /ca Subdomain(s) Wastewater, Infrastructure Language en Status completed Analyzed at 2026-03-19 10:37:44.571575+00:00 Relevance Project assessment and approval for new wastewater lagoon and pumping station.

Q Qualitative Requirements (7)

Req ID Category Intent Legal Status Name Subdomain(s) Context Conditions Confidence
#Q001administrativeunknownmandatoryProject Assessment ResponsibilitywastewaterThe listed authorities are responsible for the project assessment.Applies to non-designated projects on federal lands or outside Canadahigh
#Q002treatmenttreatmentmandatoryLagoon Treatment ScopewastewaterThe lagoon will treat raw sewage.medium
#Q003designoperationalmandatoryForce Main Burial DepthwastewaterForce mains will be buried to a minimum of 3m cover.Construction of sewage force mainshigh
#Q004designtreatmentmandatoryDesign Population CapacitywastewaterIt has been design to meet the ten year population growth, with allowances for expansion to meet the twenty year design.Lagoon design phasehigh
#Q005designtreatmentmandatoryLagoon Surface AreawastewaterTotal area of the lagoon will be 16ha.Lagoon constructionhigh
#Q006designoperationalmandatorySewage Pumping Station AreawastewaterSewage pumping stations will use an area of 0.1ha each (2).Construction of two sewage pumping stationshigh
#Q007designoperationalmandatoryLagoon and Pumping Station Construction ObligationwastewaterDesign and construct a new lagoon and Sewage Pumping Station on Muskowekwan IR 85 within Sec15 TP27 R15 W2M (lagoon & sewage pumping station), Sec14 TP27 R15 W2M (sewage force main), and Sec 11 TP27 R15 W2M (sewage force main & sewage pumping station).Muskowekwan IR 85 project boundarieshigh

P Quantitative Requirements (6)

Req ID Category Intent Legal Status Name Subdomain(s) Limit Type Limit Value Context Conditions Confidence
#P001designtreatmentmandatoryLagoon total areawastewaterrequirement16 haTotal area of the lagoon will be 16ha.high
#P002designoperationalmandatoryForce main cover depthwastewaterrequirement>= 3 mForce mains will be buried to a minimum of 3m cover.high
#P003designoperationalmandatorySewage pumping station areawastewaterrequirement0.1 haSewage pumping stations will use an area of 0.1ha each (2).Eachhigh
#P004designoperationalmandatoryQuantity of sewage pumping stationswastewaterrequirement2 stationsSewage pumping stations will use an area of 0.1ha each (2).high
#P005designtreatmentmandatoryDesign population growth horizonwastewaterrequirement10 yearsIt has been design to meet the ten year population growthhigh
#P006designtreatmentmandatoryDesign expansion horizonwastewaterrequirement20 yearswith allowances for expansion to meet the twenty year designhigh