| #R001 | design | treatment | mandatory | Primary cell size | wastewater | requirement | 3.09 hectare | A new facultative lagoon with a 3.09 hectare sized primary cell | | high |
| #R002 | design | treatment | mandatory | Storage cell capacity | wastewater | requirement | 117115 cubic metres | a storage cell sized with a capacity of 117,115 cubic metres will be constructed | | high |
| #R003 | design | operational | mandatory | Access road length | wastewater | requirement | 1 km | approximately 1 km of newly constructed roadway to provide access to the lagoon from Highway 15 | | high |
| #R004 | design | operational | mandatory | Sewage force main piping length | wastewater | requirement | 5.3 kilometres | Approximately 5.3 kilometres of new sewage force main piping will be installed | | high |
| #R005 | design | operational | mandatory | Sanitary sewer replacement length | wastewater | requirement | 240 metres | approximately 240 metres of existing sanitary sewer to tie-in the proposed sewage pumping stations to the existing gravity sewer system will be replaced | | high |