| Req ID | Category | Intent | Legal Status | Name | Subdomain(s) | Context | Conditions | Confidence |
|---|---|---|---|---|---|---|---|---|
| #Q001 | administrative | unknown | mandatory | Project Assessment Responsibility | other | The listed authorities are responsible for the project assessment. | This is a non-designated project on federal lands or outside Canada. | low |
| #Q002 | design | operational | mandatory | Concrete Slab Installation | other | installation of a new concrete slab on grade | Infrastructure Support to Fuel Testing Lab project at 12 Wing Shearwater | high |
| #Q003 | design | operational | mandatory | Waste Fuel Tank Replacement | other | replacement of an outside aboveground 2,000 Liter waste turbo fuel storage tank | Infrastructure Support to Fuel Testing Lab project at 12 Wing Shearwater | high |
| #Q004 | design | treatment | mandatory | Oil Interceptor Installation | wastewater | replacement of an inside oil-water separator with a new inside 200 Liter/minute oil interceptor | Infrastructure Support to Fuel Testing Lab project at 12 Wing Shearwater | high |
| #Q005 | prohibition | operational | mandatory | Non-Explosion Proof Equipment Restriction | other | The procured fuel testing lab is explosion proof and will not be suitable for other equipment that is not explosion proof | Usage of the new fuel testing lab at the aviation fuel farm | high |
| Req ID | Category | Intent | Legal Status | Name | Subdomain(s) | Limit Type | Limit Value | Context | Conditions | Confidence |
|---|---|---|---|---|---|---|---|---|---|---|
| #P001 | design | operational | unknown | waste turbo fuel storage tank capacity | other | requirement | 2,000 Liter | replacement of an outside aboveground 2,000 Liter waste turbo fuel storage tank | low | |
| #P002 | design | treatment | unknown | oil interceptor flow capacity | wastewater | requirement | 200 Liter/minute | replacement of an inside oil-water separator with a new inside 200 Liter/minute oil interceptor | low |
| Req ID | Category | Name | Context | Confidence |
|---|---|---|---|---|
| #D001 | DND | Department of National Defence | high | |
| #D002 | RHUs | residential housing units | high | |
| #D003 | CFB | Canadian Forces Base | high | |
| #D004 | HRM | Halifax Regional Municipality | high | |
| #D005 | CFAD | Canadian Forces Ammunition Depot | high | |
| #D006 | LNAPL | Light Non-Aqueous Phase Liquid | high | |
| #D007 | RPAS | Remotely Piloted Aircraft System | high | |
| #D008 | VOR | Very High Frequency Omni-directional Range | high | |
| #D009 | INFERNO | Instructional Natural Fire Environment for Readiness in Operations | high | |
| #D010 | BIO | Bedford Institute of Oceanography | high | |
| #D011 | FIMS | Facility for Intelligent Marine Systems | high | |
| #D012 | FLR | Fish Lab Renovations | high | |
| #D013 | MPP | Mail Processing Plant | high | |
| #D014 | ASEC | Atlantic Science Enterprise Centre | high | |
| #D015 | LCD | Letter Carrier Depot | high | |
| #D016 | NS | Nova Scotia | high | |
| #D017 | PCD | Pictou County Detachment | high | |
| #D018 | NRS | Naval Radio Station | high |