| #Q001 | treatment | treatment | mandatory | Point-of-Entry (POE) Treatment Processes | drinking water | The POE systems will utilize a combination of treatment processes involving sediment filters, air injection oxidation filters, granular activated carbon (GAC) filters, cartridge filters, and ion exchange resin to treat groundwater. | | high |
| #Q002 | treatment | treatment | mandatory | Primary Disinfection Method | drinking water | Primary disinfection will be achieved using ultraviolet irradiation. | | high |
| #Q003 | design | operational | mandatory | POE Treatment System Enclosure | drinking water | The POE treatment systems will be housed in an outdoor wooden enclosure and will be built on member-owned land. | | high |
| #Q004 | design | operational | mandatory | Service Connection Infrastructure | drinking water | All service connections will include a shut-off valve, a water meter, backflow preventor, and a pressure-reducing valve in an accessible location inside the residence. | | high |
| #Q005 | design | operational | mandatory | Service Connection Pipe Penetrations | drinking water | Pipe penetrations for service connections will be located below the frost line and hydraulically sealed prior to commissioning. | | high |
| #Q006 | operational | health | mandatory | Existing Well Decommissioning | drinking water | Existing wells will be decommissioned. | Upon construction of drilled wells for residences affected by low yield and water quality issues. | high |
| #Q007 | operational | operational | mandatory | Well Pump Rate Limits | drinking water | Pump rates will be set so as to not exceed the maximum recharge rate of the well. | | high |
| #Q008 | design | health | mandatory | Septic Field Precaution and Mitigation | wastewater, drinking water | Septic fields on private property have also been identified and appropriate precaution/mitigation will be defined with direct communication with the utility owner prior to finalizing any design drawings. | Prior to finalizing any design drawings. | high |
| #Q009 | design | operational | mandatory | Service Connection Pipe Specification | drinking water | These connections will consist of 25mm piping. | Applicable to the 11 planned watermain service connections. | high |
| #Q010 | monitoring | operational | mandatory | Environmental Mitigation and Monitoring Implementation | other | Mitigation and monitoring measures taken into account for this determination included active and adaptive management measures that would be implemented for the protection of the local environment. | Required following the Notice of Determination issued March 20, 2023. | high |