Parameter Viewer

Document ID ca-ggfnwiu-2024-12-04 Title George Gordon First Nation Wastewater Infrastructure Upgrades URL https://iaac-aeic.gc.ca/050/evaluations/proj/88915 Jurisdiction /ca Subdomain(s) Wastewater treatment, Infrastructure and distribution Language en Status completed Analyzed at 2026-03-20 07:26:08.443564+00:00 Relevance Environmental determination for new wastewater lagoon and infrastructure.

Q Qualitative Requirements (5)

Req ID Category Intent Legal Status Name Subdomain(s) Context Conditions Confidence
#Q001administrativeunknownmandatoryProject Assessment ResponsibilityotherThe listed authorities are responsible for the project assessment.Applies to non-designated projects on federal lands or outside Canada.medium
#Q002operationaloperationalmandatoryDecommissioning of Existing Lagoonwastewater, otherThe existing lagoon will be decommissioned and returned to a natural vegetative state upon commissioning of the new sewage lagoon.Upon commissioning of the new sewage lagoon.medium
#Q003operationaloperationalmandatorySite Preparation ActivitieswastewaterSite preparation activities will include stripping and stockpiling of topsoil from the proposed lagoon site and the pipeline utility right of way.medium
#Q004designoperationalmandatoryLagoon Construction ExecutionwastewaterConstruction of the lagoon will include excavation to cell floor elevations and placement of earthen fill to construct the perimeter berms.medium
#Q005designoperationalmandatorySewage Force Main Installation ExecutionwastewaterInstallation of new sewage force mains will include excavation to designated depths, installation of piping, backfill, and topsoil replacement.medium

P Quantitative Requirements (5)

Req ID Category Intent Legal Status Name Subdomain(s) Limit Type Limit Value Context Conditions Confidence
#R001designoperationalunknownPrimary cell sizewastewaterrequirement0.72 hectaresize of the primary cell in the new facultative lagoonhigh
#R002designoperationalunknownStorage cell capacitywastewaterrequirement16455 cubic metrescapacity of the storage cell in the new facultative lagoonhigh
#R003designoperationalunknownNew roadway lengthotherrequirement~ 1 kmlength of newly constructed roadway to provide access to the lagoonhigh
#R004designoperationalunknownSewage force main lengthwastewaterrequirement~ 1 kmlength of new sewage force main piping to be installedhigh
#R005designoperationalunknownLagoon site distancewastewaterrequirement~ 1 kmdistance of the proposed lagoon site northeast of the existing community lagoonhigh

D Definitions (0)

No definitions.