| #P001 | design | operational | mandatory | Excavation area | other | requirement | 20 square metre | Excavation of a 20 square metre area to a depth of approximately 2 metres | Proposed amended works for Fibreco Terminal Enhancement Project | high |
| #P002 | design | operational | mandatory | Excavation depth | other | requirement | 2 metres | Excavation of a 20 square metre area to a depth of approximately 2 metres | Proposed amended works for Fibreco Terminal Enhancement Project | high |
| #P003 | design | operational | mandatory | PVC pipe diameter | other | requirement | 450 millimetre | Installation of a 450 millimetre PVC pipe, approximately 20 metres in length | Proposed amended works for Fibreco Terminal Enhancement Project | high |
| #P004 | design | operational | mandatory | PVC pipe length | other | requirement | 20 metres | Installation of a 450 millimetre PVC pipe, approximately 20 metres in length | Proposed amended works for Fibreco Terminal Enhancement Project | high |
| #P005 | design | operational | mandatory | Rip rap width | other | requirement | 1 metre | Installation of rip rap (approximately 1 metre wide by 1 metre depth) | Proposed amended works for Fibreco Terminal Enhancement Project | high |
| #P006 | design | operational | mandatory | Rip rap depth | other | requirement | 1 metre | Installation of rip rap (approximately 1 metre wide by 1 metre depth) | Proposed amended works for Fibreco Terminal Enhancement Project | high |
| #P007 | design | operational | mandatory | Filter rock size | other | requirement | 150 millimetre | Installation of rip rap (approximately 1 metre wide by 1 metre depth) with 150 millimetre filter rock and concrete grouting | Proposed amended works for Fibreco Terminal Enhancement Project | high |