| Req ID | Category | Intent | Legal Status | Name | Subdomain(s) | Context | Conditions | Confidence |
|---|---|---|---|---|---|---|---|---|
| #Q001 | administrative | unknown | mandatory | Project Assessment Responsibility | other | The listed authorities are responsible for the project assessment. | high | |
| #Q002 | operational | operational | mandatory | Dry Channel Construction Timing | aquatic life, other | The construction will take place after spring runoff, once the stream channel is dry so as to avoid any potential negative impacts on water quality and aquatic habitat. | After spring runoff, once the stream channel is dry | medium |
| #Q003 | design | operational | mandatory | Gabion Cage Reinforcement | other | Construction will include removal of existing vegetation from the stream bank and reinforcing it with several layers of 1m x 1m x 4m long gabion cages that will be connected together. | medium |
| Req ID | Category | Intent | Legal Status | Name | Subdomain(s) | Limit Type | Limit Value | Context | Conditions | Confidence |
|---|---|---|---|---|---|---|---|---|---|---|
| #P001 | design | operational | unknown | gabion cages dimensions | other | requirement | 1 x 1 x 4 m | reinforcing it with several layers of 1m x 1m x 4m long gabion cages that will be connected together. | Construction will take place after spring runoff, once the stream channel is dry so as to avoid any potential negative impacts on water quality and aquatic habitat. | medium |
| #P002 | design | operational | unknown | rock size | other | requirement | 4 inch | Filled with 4-inch rock, the gabions will prevent further accelerated erosion of the stream channel | medium |
No definitions.