Parameter Viewer

Document ID ca-dpsfr-2022-06-24 Title Drainage Pump Station and Floodbox Replacement URL https://iaac-aeic.gc.ca/050/evaluations/proj/81776 Jurisdiction /ca Subdomain(s) Stormwater management, Industrial water Language en Status completed Analyzed at 2026-03-19 10:46:43.994017+00:00 Relevance Environmental assessment and approval for drainage infrastructure replacement.

Q Qualitative Requirements (9)

Req ID Category Intent Legal Status Name Subdomain(s) Context Conditions Confidence
#Q001designoperationalmandatoryTemporary Isolation Coffer DamsotherAll work will be conducted in isolation of river flows by installing temporary isolation coffer dams.Work on the shoreline of the Fraser River and within the drainage ditcheshigh
#Q002operationaloperationalmandatoryContaminated Soil and Sediments ManagementotherContaminated soil and sediments have been reported in the vicinity of the project and will require management during construction of the new facility.During construction of the new facilityhigh
#Q003designoperationalmandatoryTemporary Road BypassotherA temporary road bypass will be provided to maintain vehicle and pedestrian access at all times.During temporary closure of Inglis Drivehigh
#Q004administrativeoperationalmandatoryConstruction Environmental Management Plan AdherenceotherAll works will be carried out in accordance with the construction environmental management plan.high
#Q005operationaloperationalmandatoryIn-water Works Timing Windowaquatic lifeIn-water works in the Fraser River will be scheduled during the least risk timing window for the protection of fish and fish habitat (July 16 to January 31).In-water works in the Fraser Riverhigh
#Q006operationaloperationalmandatoryInstream Works Flow Isolationaquatic life, otherInstream works shall be conducted in the dry and in isolation of flow.Instream workshigh
#Q007administrativeoperationalmandatorySpill Prevention and Emergency Response PlanotherThe project shall develop and implement a spill prevention and emergency response plan.high
#Q008operationaloperationalmandatoryArchaeology Chance Find Management PlanotherAll excavation work will be conducted under an archaeology chance find management plan.All excavation workhigh
#Q009monitoringunknownmandatoryEnvironmental Professional Monitoringaquatic lifeA qualified environmental professional will be retained to monitor project activities that may result in potential adverse effects to aquatic habitat.During project activities that may result in potential adverse effects to aquatic habitathigh

P Quantitative Requirements (2)

Req ID Category Intent Legal Status Name Subdomain(s) Limit Type Limit Value Context Conditions Confidence
#R001operationaloperationalmandatoryIn-water works timing windowaquatic liferequirementJuly 16 to January 31 datesProtection of fish and fish habitatIn-water works in the Fraser Riverhigh
#R002designoperationalmandatoryProject Areaotherrequirement4000 sq metersThe project area is approximately 4,000 sq metershigh