| Req ID | Category | Intent | Legal Status | Name | Subdomain(s) | Context | Conditions | Confidence |
|---|---|---|---|---|---|---|---|---|
| #Q001 | operational | operational | mandatory | Removal and Sealing Procedure for Accessible OWWP | wastewater | This will involve removing the pipe connection, sealing the hole in the jetty mount to prevent potential hook ups and environmental releases from a nonfunctioning system and removing accessible OWWP lines within the steam tunnels and dug trenches. | Applicable to accessible portions of the OWWP beginning at the hook up point at each mechanical jetty mount | high |
| #Q002 | operational | operational | mandatory | Inaccessible OWWP Capping and Abandonment | wastewater | OWWP that must remain because of inaccessibility will be capped and abandoned in place underground with a capping point accessible from the tunnels. | Applicable to OWWP that must remain because of inaccessibility | high |
| #Q003 | prohibition | operational | mandatory | Excavation and Infrastructure Destruction Prohibition | other | This project will not involve any excavation or destruction of existing infrastructure in order to remove OWWP. | During the removal of OWWP | high |
| #Q004 | reporting | reporting | mandatory | Recording and Future Addressing of Abandoned OWWP | wastewater | OWWP abandoned in place will be recorded and addressed during future projects that will unearth this piping in the future as they occur. | When OWWP is abandoned in place underground | high |
No quantitative requirements.
No definitions.