Document ID ca-dlspsu-2024-03-11 Title Deschambault Lake Sewage Pumping Station Upgrades URL https://iaac-aeic.gc.ca/050/evaluations/proj/87300 Jurisdiction /ca Subdomain(s) Wastewater, Stormwater Language en Status completed Analyzed at 2026-03-20 08:02:26.005101+00:00 Relevance Project approval and technical scope for sewage pumping station upgrades.

Q Qualitative Requirements (8)

Req ID Category Intent Legal Status Name Subdomain(s) Context Conditions Confidence
#Q001operationaloperationalmandatoryClearing and Grubbing Timing ConstraintwastewaterClearing and grubbing of the site at all SPS locations will take place outside of the migratory bird nesting season.At all SPS locationshigh
#Q002operationaloperationalmandatoryTopsoil Retention ProcedurewastewaterTopsoil will be retained, unmixed, near the site from which it was removed.high
#Q003operationaloperationalmandatoryDemolition and Salvage SpecificationswastewaterThe existing fence will be removed and the entire existing structure will be selectively demolished and salvaged except for the wet well at each SPS location.At each SPS locationhigh
#Q004designoperationalmandatorySPS Superstructure ConstructionwastewaterA new, expanded SPS superstructure composed of electrical room, generator room and pump room as required at each site will be constructed.At each sitehigh
#Q005designoperationalmandatorySite Regrading and Stormwater DrainagewastewaterThe SPS sites will be regraded so that stormwater drains freely away from the proposed buildings and to limit flooding from runoff flows caused by rainfall events or snow melt.high
#Q006designunknownmandatoryImported Soil QualitywastewaterAll imported soil materials will be clean and free of hazardous materials.Applies to imported soil materialshigh
#Q007designoperationalmandatorySecurity Fence SpecificationswastewaterA new maintenance-free, industrial grade security fence (min overall height of 1.83m) will be installed around each site and will include a vehicle access swing gate and a pedestrian door entrance, both with locks.Around each sitehigh
#Q008designoperationalmandatoryBack-up Power System RequirementwastewaterBack up power systems is also included in the upgraded design.high

P Quantitative Requirements (1)

Req ID Category Intent Legal Status Name Subdomain(s) Limit Type Limit Value Context Conditions Confidence
#P001designoperationalmandatorySecurity fence overall heightwastewaterrequirement>= 1.83 mA new maintenance-free, industrial grade security fence (min overall height of 1.83m) will be installed around each site and will include a vehicle access swing gate and a pedestrian door entrance, both with locks.high

D Definitions (0)

No definitions.