Document ID ca-bucrna-2025-02-12 Title Bunibonibee Cree Nation - Remediation of Former Wastewater Treatment Plant Project URL https://iaac-aeic.gc.ca/050/evaluations/proj/89170 Jurisdiction /ca Subdomain(s) Wastewater treatment, Water infrastructure Language en Status completed Analyzed at 2026-03-19 08:41:52.810160+00:00 Relevance Notice of determination for the remediation and decommissioning of a former WWTP.

Q Qualitative Requirements (6)

Req ID Category Intent Legal Status Name Subdomain(s) Context Conditions Confidence
#Q001operationaloperationalmandatoryTemporary erosion and sediment controlotherA temporary workpad will be constructed in Oxford Lake and temporary erosion and sediment control measures will be installed (silt fence and turbidity curtain).During project construction in Oxford Lakehigh
#Q002operationaloperationalmandatoryDismantling and disposal of former WWTP infrastructurewastewaterExisting infrastructure consists of the former WWTP building and remaining subsurface pumphouse infrastructure (foundation, underground storage tanks, etc.) which will be dismantled, excavated, and removed from the Site, with disposal at the community landfill.high
#Q003operationaloperationalmandatoryRemoval and capping of underground utilitiesdrinking water, wastewaterExisting underground utilities (such as abandoned water and sewage lines) will also be removed and capped at the extent of the excavation footprint.high
#Q004operationaloperationalmandatoryRemoval of water intakes and outfall linedrinking water, wastewater, otherExisting water intakes and an outfall line resting on the bed of Oxford Lake will be removed by pulling from shore.high
#Q005administrativehealthrecommendedTemporary relocation of residentsotherThe remedial works are approximately 40 m from an existing residential triplex. Temporary relocation of residents during the project has been recommended.During the projecthigh
#Q006operationaloperationalmandatoryFuel staging and refueling setbackotherFuel will be sourced from the existing Band tankfarm, 1 km south of the Site and delivered via refueling trucks to a designated staging area at least 100 m for Oxford Lake.Applies to all refueling operations during project executionhigh

P Quantitative Requirements (1)

Req ID Category Intent Legal Status Name Subdomain(s) Limit Type Limit Value Context Conditions Confidence
#R001operationaloperationalmandatoryRefueling staging area setback from Oxford Lakeotherrequirement>= 100 mFuel will be sourced from the existing Band tankfarm, 1 km south of the Site and delivered via refueling trucks to a designated staging area at least 100 m for Oxford Lake.During fuel delivery and staging for remediation activitieshigh