| #Q001 | operational | operational | mandatory | Temporary erosion and sediment control | other | A temporary workpad will be constructed in Oxford Lake and temporary erosion and sediment control measures will be installed (silt fence and turbidity curtain). | During project construction in Oxford Lake | high |
| #Q002 | operational | operational | mandatory | Dismantling and disposal of former WWTP infrastructure | wastewater | Existing infrastructure consists of the former WWTP building and remaining subsurface pumphouse infrastructure (foundation, underground storage tanks, etc.) which will be dismantled, excavated, and removed from the Site, with disposal at the community landfill. | | high |
| #Q003 | operational | operational | mandatory | Removal and capping of underground utilities | drinking water, wastewater | Existing underground utilities (such as abandoned water and sewage lines) will also be removed and capped at the extent of the excavation footprint. | | high |
| #Q004 | operational | operational | mandatory | Removal of water intakes and outfall line | drinking water, wastewater, other | Existing water intakes and an outfall line resting on the bed of Oxford Lake will be removed by pulling from shore. | | high |
| #Q005 | administrative | health | recommended | Temporary relocation of residents | other | The remedial works are approximately 40 m from an existing residential triplex. Temporary relocation of residents during the project has been recommended. | During the project | high |
| #Q006 | operational | operational | mandatory | Fuel staging and refueling setback | other | Fuel will be sourced from the existing Band tankfarm, 1 km south of the Site and delivered via refueling trucks to a designated staging area at least 100 m for Oxford Lake. | Applies to all refueling operations during project execution | high |