Document ID ca-awmn2spp-2023-04-21 Title Annacis Water Main No. 2 Scour Protection project URL https://iaac-aeic.gc.ca/050/evaluations/proj/84262 Jurisdiction /ca Subdomain(s) Drinking water, Infrastructure Language en Status completed Analyzed at 2026-03-18 15:36:46.784675+00:00 Relevance Environmental approval for water main infrastructure protection works.

Q Qualitative Requirements (1)

Req ID Category Intent Legal Status Name Subdomain(s) Context Conditions Confidence
#Q001administrativeunknownmandatoryProject Assessment ResponsibilityotherThe listed authorities are responsible for the project assessment.Applies to the non-designated project on federal lands or outside Canada.medium

P Quantitative Requirements (7)

Req ID Category Intent Legal Status Name Subdomain(s) Limit Type Limit Value Context Conditions Confidence
#P001designunknownunknownBlended rock placement volumeotherunknown701 cubic metresThe Project will consist of placement of approximately 701 cubic metres of blended rockusing a clamshell bucketlow
#P002designunknownunknownBlended rock placement footprintotherunknown1,078 square metrewithin an approximately 1,078 square metre footprintusing a clamshell bucketlow
#P003designunknownunknownScour protection placement elevationotherunknown-0.5 to -5.0 metres Geodetic DatumScour protection will be placed between approximately -0.5 to -5.0 metres Geodetic Datumlow
#P004designunknownunknownScour protection thicknessotherunknown0.5 metresto a thickness of approximately 0.5 metreslow
#P005designunknownunknownOverlap scour protection volumedrinking waterrequirement480 cubic metresApproximately 480 cubic metres of material within an approximately 738 square metre footprint will overlap scour protection placed in 2019overlap scour protection placed in 2019high
#P006designunknownunknownOverlap scour protection footprintdrinking waterrequirement738 square metreApproximately 480 cubic metres of material within an approximately 738 square metre footprint will overlap scour protection placed in 2019overlap scour protection placed in 2019high
#P007operationaloperationalunknownProject durationdrinking waterrequirement10 daysThe Project is anticipated to take approximately 10 days to completeanticipated durationhigh