| #P001 | design | unknown | unknown | Blended rock placement volume | other | unknown | 701 cubic metres | The Project will consist of placement of approximately 701 cubic metres of blended rock | using a clamshell bucket | low |
| #P002 | design | unknown | unknown | Blended rock placement footprint | other | unknown | 1,078 square metre | within an approximately 1,078 square metre footprint | using a clamshell bucket | low |
| #P003 | design | unknown | unknown | Scour protection placement elevation | other | unknown | -0.5 to -5.0 metres Geodetic Datum | Scour protection will be placed between approximately -0.5 to -5.0 metres Geodetic Datum | | low |
| #P004 | design | unknown | unknown | Scour protection thickness | other | unknown | 0.5 metres | to a thickness of approximately 0.5 metres | | low |
| #P005 | design | unknown | unknown | Overlap scour protection volume | drinking water | requirement | 480 cubic metres | Approximately 480 cubic metres of material within an approximately 738 square metre footprint will overlap scour protection placed in 2019 | overlap scour protection placed in 2019 | high |
| #P006 | design | unknown | unknown | Overlap scour protection footprint | drinking water | requirement | 738 square metre | Approximately 480 cubic metres of material within an approximately 738 square metre footprint will overlap scour protection placed in 2019 | overlap scour protection placed in 2019 | high |
| #P007 | operational | operational | unknown | Project duration | drinking water | requirement | 10 days | The Project is anticipated to take approximately 10 days to complete | anticipated duration | high |