| Req ID | Category | Intent | Legal Status | Name | Subdomain(s) | Context | Conditions | Confidence |
|---|---|---|---|---|---|---|---|---|
| #R001 | administrative | reporting | mandatory | Authority Responsibility for Project Assessment | drinking water | The listed authorities are responsible for the project assessment. | Applies to non-designated projects on federal lands or outside Canada | high |
| Req ID | Category | Intent | Legal Status | Name | Subdomain(s) | Limit Type | Limit Value | Context | Conditions | Confidence |
|---|---|---|---|---|---|---|---|---|---|---|
| #R002 | design | treatment | mandatory | Service connections | drinking water | requirement | 18 connections | Service connections to public buildings as part of new construction | high | |
| #R003 | design | treatment | mandatory | New point-of-entry systems | drinking water | requirement | 10 systems | Point-of-entry systems included in new construction | high | |
| #R004 | design | treatment | mandatory | POE system upgrades | drinking water | requirement | 32 systems | Upgrades to existing point-of-entry systems | high | |
| #R005 | design | treatment | mandatory | Production well count | drinking water | requirement | 1 well | New construction for Alderville First Nation | high | |
| #R006 | design | treatment | mandatory | New water treatment plant count | drinking water | requirement | 1 plant | New construction of a high capacity water treatment plant | high | |
| #R007 | design | treatment | mandatory | Underground reservoir count | drinking water | requirement | 1 reservoir | New construction of an underground reservoir for water storage | high | |
| #R008 | design | treatment | mandatory | High lift pumping station count | drinking water | requirement | 1 station | New construction of a high lift pumping station | high | |
| #R009 | design | treatment | mandatory | Decommissioned treatment plant count | drinking water | requirement | 1 plant | Decommissioning of small water system treatment plant | high |
| Req ID | Category | Name | Context | Confidence |
|---|---|---|---|---|
| #D001 | the Proponent | The Alderville First Nation | high | |
| #D002 | TRPC | Trent Rapids Power Corporation | high | |
| #D003 | PUI | Peterborough Utilities Inc | high | |
| #D004 | PLS | Pickering Lands Site | high | |
| #D005 | TNPI | Trans Northern Pipelines Inc. | high | |
| #D006 | LSEP | Lake Scugog Enhancement Project | high | |
| #D007 | KLCC | Kenhtè:ke Language and Cultural Centre | high | |
| #D008 | A-OTHR | Arctic Over-the-Horizon Radar | high | |
| #D009 | CFB | Canadian Forces Base | high | |
| #D010 | CJIM | Combined Joint Intelligence Modernization | high | |
| #D011 | EPC | Energy Performance Contract | high | |
| #D012 | CFSCE | Canadian Forces School of Communications and Electronics | high | |
| #D013 | CFSMI | Canadian Forces School of Military Intelligence | high | |
| #D014 | HVAC | Heating, Ventilation, and Air Conditioning | high | |
| #D015 | GTAA | Toronto Pearson International Airport | medium | |
| #D016 | CCIW | Center for Inland Water | high | |
| #D017 | PS | Postal Service | high | |
| #D018 | the Site | CFB Borden | high | |
| #D019 | Vision 2010 | The Proposal by Cameco Corporation for the Redevelopment of its Port Hope Conversion Facility | high |