Parameter Viewer

Document ID ca-2bawtb-2025-08-04 Title 2025 BioVectra Aqueous Waste Treatment Building URL https://iaac-aeic.gc.ca/050/evaluations/proj/89681 Jurisdiction /ca Subdomain(s) Industrial Wastewater, Wastewater Treatment, Stormwater Management Language en Status completed Analyzed at 2026-03-19 20:58:27.641811+00:00 Relevance Environmental assessment and approval for an industrial wastewater facility.

Q Qualitative Requirements (5)

Req ID Category Intent Legal Status Name Subdomain(s) Context Conditions Confidence
#Q001operationaloperationalmandatoryStormwater and Sediment Control Provisionwastewater, otherDuring the construction phase, stormwater runoff and sediment control measures will be provided by the site contractor and reviewed by the Construction Project Manager on a regular basis.During the construction phasehigh
#Q002designoperationalmandatorySilt Fencing and Straw Bales InstallationotherThis will include installing silt fencing, straw bales and other measures as required.During the construction phasehigh
#Q003operationaloperationalmandatoryConstruction Debris DisposalotherAll construction debris (including any excess site soils) will be disposed of in a provincially approved manner.high
#Q004operationaloperationalmandatoryMonitoring Well DecommissioningotherAny monitoring wells on the proposed expansion footprint would be decommissioned/relocated as required.Any monitoring wells on the proposed expansion footprinthigh
#Q005administrativeunknownmandatoryCode and Standard Compliancewastewater, otherDuring construction and operation (including accidents, potential malfunctions and unplanned events) all municipal, provincial and federal codes, standards and best management practices will be followed.During construction and operation (including accidents, potential malfunctions and unplanned events)high

P Quantitative Requirements (0)

No quantitative requirements.

D Definitions (0)

No definitions.