| Req ID | Category | Intent | Legal Status | Name | Subdomain(s) | Context | Conditions | Confidence |
|---|---|---|---|---|---|---|---|---|
| #Q001 | operational | operational | mandatory | Stormwater and Sediment Control Provision | wastewater, other | During the construction phase, stormwater runoff and sediment control measures will be provided by the site contractor and reviewed by the Construction Project Manager on a regular basis. | During the construction phase | high |
| #Q002 | design | operational | mandatory | Silt Fencing and Straw Bales Installation | other | This will include installing silt fencing, straw bales and other measures as required. | During the construction phase | high |
| #Q003 | operational | operational | mandatory | Construction Debris Disposal | other | All construction debris (including any excess site soils) will be disposed of in a provincially approved manner. | high | |
| #Q004 | operational | operational | mandatory | Monitoring Well Decommissioning | other | Any monitoring wells on the proposed expansion footprint would be decommissioned/relocated as required. | Any monitoring wells on the proposed expansion footprint | high |
| #Q005 | administrative | unknown | mandatory | Code and Standard Compliance | wastewater, other | During construction and operation (including accidents, potential malfunctions and unplanned events) all municipal, provincial and federal codes, standards and best management practices will be followed. | During construction and operation (including accidents, potential malfunctions and unplanned events) | high |
No quantitative requirements.
No definitions.